-
lateral view of constructe sculpture nº 2015-9. The picture shows the bearing structure (in red) which keeps all together.
-
indoor shot of constructe sculpture nº 2015-9.
-
the output plan for the sculpture nº 2015-9 is the solid basis for the manual craft and all the orders for necessary the parts.
-
carcass of the constructe sculptur nº 2015-9 in the workshop. To specify the exact geometry is primordial.
-
Field installation of constructe nº 2015-9. On the knees the crane operator, standing Magnus Frei foreman metallworker
-
bearing structure of constructe sculpture nº2015-9 (red) with pivotal element (black).